Case Study
Swimming Pool Construction, Sunbury-on-Thames and North Surrey — Excavation to Finish
A step-by-step record of a swimming pool construction project, one of the pool builds we carry out in Sunbury-on-Thames and across North Surrey. Photographs from every stage: excavation, blinding, concrete shell, brickwork steps, rendering, lining and fill.
The pool build sequence
A swimming pool is the most structurally demanding project in domestic landscaping. Every stage depends on the previous one being done correctly. The excavation has to be the right shape before blinding. The blinding has to be level before the concrete shell. The shell has to be cured before rendering. The render has to be sound before the liner goes in. Carmen Landscapes manages this sequence on every pool build, with Craig Carmen leading setting out and installation throughout.
Stage 1: Excavation
The pool build starts with excavation. The pool profile is marked out and dug to the correct depth, with the spoil removed from site. The base is then blinded with a layer of compacted hardcore to create a stable, level platform for the structural concrete. Drainage and pipe routes are laid at this stage, before any concrete goes down.


Stage 2: Concrete Shell & Blinding
With the base prepared, the concrete shell is formed. A concrete ring beam or surround locks the pool profile in place. The structural pipework (inlets, outlets, main drain) is positioned precisely at this stage. The geometry has to be right: mistakes here propagate through every subsequent stage.


Stage 3: Brickwork Steps
Pool steps are built in blockwork or brick, formed to the step profile and bonded into the pool shell. This requires careful setting out to get the tread depth, rise and radius correct. The steps shown here are curved, a more demanding coursing job than a straight stair. They're built solid, not formed on a frame, so they'll perform for the life of the pool.

Stage 4: Pool Wall Construction & Refurbishment
Whether building new or refurbishing an existing pool, the wall construction stage is where the pool takes its final shape. Old render and tiles are stripped. New blockwork or concrete is formed to the correct profile. Pipework for filtration, lights and inlets is set into the structure before rendering begins.


Stage 5: Rendering
Rendering is applied to the walls, floor and steps to create a smooth, continuous surface ready for the liner. The render mix and application technique matter: too wet or too rushed and the surface won't bond the liner correctly. We render in stages, allowing each coat to cure before the next is applied.


Stage 6: Liner Installation & Finish
The liner goes in over the rendered shell. Fittings (inlet nozzles, light bezels, main drain covers) are cut in and sealed. The filtration equipment is commissioned and the pool is filled. The surrounding paving and landscaping is finished once the pool structure is complete and the surrounding ground has settled.


Planning swimming pool construction in Sunbury-on-Thames?
Pool construction is a significant project and the right team matters at every stage. Carmen Landscapes handles the full build, from the initial excavation through to the filled and commissioned pool, with Craig Carmen personally leading setting out and construction. We're based in Walton-on-Thames, a few minutes from Sunbury-on-Thames, and carry out pool builds across North Surrey. Site visits are free and there's no obligation.
See our groundworks and site preparation service, our swimming pools page, or our Sunbury-on-Thames landscapers page.